Project Information

📍 Location: No. 152 Dien Bien Phu Street, Ward 25, Binh Thanh District, Ho Chi Minh City
📐 Scale: Total land area of ​​5,745 m²; office tower (CII Tower) occupies 2,875 m²; 27 above-ground floors and 2 basement levels
🎨 Investor: Ho Chi Minh City Infrastructure Investment Joint Stock Company (CII)
⏱️ Time of execution: 48 mouths

📋 Implementation stages:

  • ✔️ Stage 1: Dossier for fire safety design approval.
  • ✔️ Stage 2: Rough installation (fire alarm wiring, emergency exit lights, fire-fighting piping, and lightning protection grounding pits).
  • ✔️ Stage 3: Complete equipment installation. Technical acceptance.
  • ✔️ Stage 4: Fire safety acceptance and licensing; Handover, operational guidance, and commissioning of the facility.