Project Information

📍 Location: Lot A1-2, Area A1, D4 Street, Tan Phu Trung Industrial Park, Tram Bom Hamlet, Tan Phu Trung Ward, Cu Chi District, Ho Chi Minh City, Vietnam
📐 Scale: A synchronized industrial complex featuring permanent pre-engineered heavy steel structures designed to meet clean and safe modern manufacturing standards
🎨 Investor: Gia Thy Investment Joint Stock Company
⏱️ Time of execution: 11 mouths

📋 Implementation stages:

  • ✔️ Stage 1: Dossier for fire safety design approval.
  • ✔️ Stage 2: Rough installation (fire alarm wiring, emergency exit lights, fire-fighting piping, and lightning protection grounding pits).
  • ✔️ Stage 3: Complete equipment installation. Technical acceptance.
  • ✔️ Stage 4: Fire safety acceptance and licensing; Handover, operational guidance, and commissioning of the facility.
Our services